

Android GPS Tracker Global Positioning & Real-Time Location
৳2200
৳1490
32% OFF
Category: Accessories
Key Features:
- Google Certified Smart Tracker: Designed exclusively for Android devices, compatible with the Google Find My Device app to track keys, wallets, backpacks, suitcases, and other valuables. Not compatible with iOS. 
- Global Tracking: Locate your items in real time using Bluetooth (up to 180 ft) or on the map when out of range. Built-in speaker helps you find nearby items via sound. 
- Shareable Access: Share the location of your tracker with up to 5 people without sending notifications as the item moves, allowing trusted family or friends to assist in locating your belongings. 
- Lost Mode Activation: Mark items as lost to leverage the Google Find My network; hundreds of millions of devices help locate your belongings with automatic notifications when detected. 
- IP66 Waterproof & Dust Resistant: Safe for outdoor use; resistant to splashes, rain, and heavy dust, suitable for workshops and outdoor activities. 
- Privacy Protection: Encrypted and anonymous data transmission via Google’s network ensures that no location history is stored on the tracker. 
Specifications:
- Model: Reyke Android GPS Tracker 
- Compatibility: Android devices only 
- Bluetooth Range: Up to 180 ft (55 meters) 
- Network: Google Find My Device Network 
- Water & Dust Resistance: IP66 
- Battery: Replaceable CR2032 button battery 
- Dimensions & Weight: Compact, lightweight design for easy portability 
- Usage: Keys, wallets, bags, luggage, and personal items tracking 






